Drafters Forum | JOBS | Drafting Standards | Funnies | Technical Dictionary | AutoCAD Tutorials | Free Lisp | Free Blocks

ARTICLE: Top ways drafters can make money online with Freelancer.com

Construction Definitions

From Draftsperson.net

AND WHAT THEY REALLY MEAN:

CONTRACTOR – A gambler who never gets to shuffle, cut, or deal.

BID OPENING – A poker game in which the losing hand wins.

BID – A wild guess carried out to two decimal points.

LOW BIDDER – A contractor who is wondering what he left out.

ENGINEERS ESTIMATE – The cost of construction in heaven.

PROJECT MANAGER – The conductor of an orchestra in which every musician is in a different union.

CRITICAL PATH METHOD – A management technique for losing your shirt under perfect control.

OSHA – A protective coating made by half-baking a mixture of fine print, red tape, split hairs, and baloney. Usually applied at random with a shotgun.

STRIKE – An effort to increase egg production by strangling the chicken.

DELAYED PAYMENT – a tourniquet applied at the pockets.

COMPLETION DATE – The point at which liquidated damages begin.

LIQUIDATED DAMAGES – A penalty for failing to achieve the impossible.

AUDITOR – People who go in after the war is lost and bayonet the wounded.

LAWYER – People who go in after the Auditors and strip the bodies.


Printable version

Toolbox

Views

Main Page | Free AutoCAD Blocks | Free Revit Families | Funnies | Drafting Standards | Drafting & CAD Forums | Structural Drafting | Technical Dictionary

Personal tools

MediaWiki