Drafters Forum | JOBS | Drafting Standards | Funnies | Technical Dictionary | AutoCAD Tutorials | Free Lisp | Free Blocks

ARTICLE: Top ways drafters can make money online with Freelancer.com

Backhoe and bridge quiz

From Draftsperson.net

Revision as of 03:43, 8 June 2007; view current revision
←Older revision | Newer revision→

Question: A Backhoe weighing 8 tons is on top of a flatbed trailer and heading east on Interstate 70 near Hays, Kansas. The extended shovel arm is made of high tensile steel and the approaching overpass is made of commercial-grade concrete, reinforced with 1 1/2 inch steel rebar spaced at 6 inch intervals in a crisscross pattern layered at 1 foot vertical spacing.

Solve: When the shovel arm hits the overpass, how fast do you have to be going to slice the bridge in half? (Assume no effect for headwind and no braking by the driver...)

Extra Credit: Solve for the time and distance required for the entire rig to come to a complete stop after hitting the overpass at the speed calculated above.


Printable version

Toolbox

Views

Main Page | Free AutoCAD Blocks | Free Revit Families | Funnies | Drafting Standards | Drafting & CAD Forums | Structural Drafting | Technical Dictionary

Personal tools

MediaWiki